Commercial Permit Application Checklist

Commercial Permit Application Checklist


In a continuing effort to better serve our customers, effective July 1, 1996, we have developed a Minimum Plans Information policy. The objective of the policy is to expedite the approval of submitted plans and ensure that the construction plans at the job site reflect all required code information. Please select the appropriate link below to view the minimum information required to be included on submitted commercial plans:

In the event that the required information is not provided on the original submitted plans, it will be required to be included on the revised project drawings, which must be submitted prior to permit issuance. We realize that the policy may necessitate extra time to make changes to the drawings; however, it will save time overall during the construction process. Please remember that the intent of this change is to assure that the relevant code requirements are specified on the project drawings. This information will help the contractor and inspector ensure that the project is constructed in compliance with the code.
Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

Commercial Information5 documents

  • Commercial Plan Review - RDP Policy for Electrical Design
    document seq 0.00
  • Commercial Plan Review - RDP Policy for Mechanical, Plumbing, and Design
    document seq 0.00
  • Commercial Inspections Requirements
    document seq 0.00
  • Special Inspections Guidelines
    document seq 0.00
  • Final Report of Special Inspections
    document seq 0.00

Commercial Checklists8 documents

  • Alterations/Renovations to Existing Buildings/Tenant Uplifts
    document seq 1.00
  • Conversion of a single family dwelling into a business office
    document seq 3.00
  • New Construction and Additions to Existing Buildings
    document seq 7.00
  • Requirements for Electrical Plans
    document seq 10.00
  • Requirements for Mechanical (HVAC) Plans
    document seq 11.00
  • Requirements for Commercial Plumbing and Gas Plans
    document seq 12.00
  • Structural Design Load Information Required on Plans for
    document seq 13.00
  • Tent Requirements
    document seq 14.00
Community Development

Location:
6602 Courts Drive, First Floor
Post Office Box 68
Prince George, VA 23875

Hours of Operation:
Monday - Friday
8:00 am - 5:00 pm, 
excluding holidays

Fax:       
(804) 722-0702

Charles Harrison Headshot. Charles is wearing a grey suit with a blue checkered tie. He is smiling for the photo.

Director

Charles L. Harrison, III (804) 722-8659
Email Me

Want to be emailed when this page is updated?

Sign Up Now