Connection Charges

Connection Charges


The following schedule of connection charges (tap fees) apply for connection to the public utility system:

METER SIZE

WATER CONNECTION FEE

SEWER CONNECTION FEE

5/8"

$3,000.00

$4,000.00

3/4"

$3,000.00

$4,000.00

1"

$11,230.00

$7,800.00

1-1/2"

$23,420.00

$16,230.00

2"

$38,670.00

$26,790.00

3"

$80,840.00

$55,960.00

4"

$133,610.00

$92,480.00

6"

$259,930.00

$179,890.00

8"

$399,630.00

$276,550.00

Connection charges for customers requiring larger than eight-inch meters shall be determined on a case by case basis and established by contract, but in no case shall be less than the capacity fee for an eight-inch meter.